⚽⚽⚽Pasión mundialista - vamos Argentina 🏅🏆🏅  Ver más

Enviar a
FL
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
40
Encuadernación
Tapa Blanda
Dimensiones
25.4 x 17.8 x 0.2 cm
Peso
0.09 kg.
ISBN13
9781727876550

Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) (en Inglés)

The Law Library (Autor) · Createspace · Tapa Blanda

Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) (en Inglés) - The Law Library

Libro Nuevo Origen: Estados Unidos
Envío: 8 a 10 días háb.
$ 19.90$ 17.56
-12%
Libro Nuevo

Quedan más de 100 unidades

$ 17.56
Llega entre el 28 Jul y el 03 Ago a FL. Seleccionar ubicación

Reseña del libro "Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) (en Inglés)"

Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) directs the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization, to submit to the Commission for approval proposed Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission directs NERC to implement the directive in two stages. In the first stage, NERC must submit, within six months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, NERC must submit, within 18 months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of benchmark GMD events on Bulk-Power System equipment and the Bulk-Power System as a whole. The Second Stage GMD Reliability Standards must identify benchmark GMD events that specify what severity GMD events a responsible entity must assess for potential impacts on the Bulk-Power System. If the assessments identify potential impacts from benchmark GMD events, the Reliability Standards should require owners and operators to develop and implement a plan to protect against instability, uncontrolled separation, or cascading failures of the Bulk-Power System, caused by damage to critical or vulnerable Bulk-Power System equipment, or otherwise, as a result of a benchmark GMD event. The development of this plan cannot be limited to considering operational procedures or enhanced training alone, but will, subject to the potential impacts of the benchmark GMD events identified in the assessments, contain strategies for protecting against the potential impact of GMDs based on factors such as the age, condition, technical specifications, system configuration, or location of specific equipment. These strategies could, for example, include automatically blocking geomagnetically induced currents from entering the Bulk-Power System, instituting specification requirements for new equipment, inventory management, isolating certain equipment that is not cost effective to retrofit, or a combination thereof. This book contains: - The complete text of the Reliability Standards for Geomagnetic Disturbances (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes