Venta Flash Hasta 60%  Ver más

Enviar a
FL
0
es
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

Idioma
esEspañolActual
enEnglish
portada Process Improvement in Power Press and Injection Moulding. Production / Process Improvement Lies in Safety Improvement (en Inglés)
Formato
Libro Físico
Año
2019
Idioma
Inglés
N° páginas
64
Encuadernación
Tapa Blanda
Dimensiones
8.66x5.91 in
ISBN13
9786200277886

Process Improvement in Power Press and Injection Moulding. Production / Process Improvement Lies in Safety Improvement (en Inglés)

Ramesh T;Loganathan L;Sankara Narayana Murthy A (Autor) · LAP LAMBERT Academic Publishing · Tapa Blanda

Process Improvement in Power Press and Injection Moulding. Production / Process Improvement Lies in Safety Improvement (en Inglés) - Ramesh T;Loganathan L;Sankara Narayana Murthy A

Libro Nuevo Importado
Envío: 12 a 17 días háb.
$ 92.02$ 36.81
-60%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan 40 unidades

$ 36.81
Llega entre el 03 Dic y el 14 Dic a FL. Seleccionar ubicación

Reseña del libro "Process Improvement in Power Press and Injection Moulding. Production / Process Improvement Lies in Safety Improvement (en Inglés)"

Power press is used for fabricating materials. The operations, performed by this machine include bending, shearing, blanking, punching and cutting operations. In the production line, lots of operations are done in the power press. As heavy tools are used in the power press, the employees who are operating the machine is more prone to injuries. In order to reduce the risk involved, we have fabricated a special attachment, which will ensure the safety of the employees. The company operates Injection molding machines for manufacturing plastic products. In the injection molding machine, the operating time is divided into six phases, which are opening, closing, holding, cooling, injection and ejection phase. Some of the machines, operated by the company, produce relatively small products which require less than five seconds. But the ejection time for all the machines regardless of small or big, is programmed as ten seconds which leads to increased cycle time which in turn, results in reduced production rate. Additionally, in our project, we have recommended the company to reprogram the ejection time to be five seconds for all small machines.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes