Compartir
NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1 (en Inglés)
Iñaki Anasagasti
(Autor)
·
Independently Published
· Tapa Blanda
NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1 (en Inglés) - NASA
$ 21.08
$ 26.35
Ahorras: $ 5.27
Elige la lista en la que quieres agregar tu producto o crea una nueva lista
✓ Producto agregado correctamente a la lista de deseos.
Ir a Mis ListasSe enviará desde nuestra bodega entre el
Viernes 07 de Junio y el
Lunes 10 de Junio.
Lo recibirás en cualquier lugar de Estados Unidos entre 1 y 3 días hábiles luego del envío.
Reseña del libro "NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1 (en Inglés)"
NASA Work Breakdown Structure (WBS) Handbook NASA SP-2016-3404We print NASA handbooks and standards for the convenience of those that use them on a daily basis. We print all of these a full 8 1/2 by 11 with large text so they are easy to read. Yes, color books are expensive to print so unless the information relies on the use of color for proper interpretation or understanding, we print most books in black and white to keep the cost down. All these documents are available for download for free from NASA, however printing them all over a network printer would take days. Why buy a book you can download free? We print this so you don't have to.All these books are available for free download from the government web site. Some are available only in electronic media. Some online docs are missing pages or barely legible. We at 4th Watch Publishing are former government employees, so we know how government employees actually use the standards. When a new standard is released, an engineer prints it out, punches holes and puts it in a 3-ring binder. While this is not a big deal for a 5 or 10-page document, many NIST documents are over 100 pages and printing a large document is a time- consuming effort. So, an engineer that's paid $75 an hour is spending hours simply printing out the tools needed to do the job. That's time that could be better spent doing engineering. We publish these documents so engineers can focus on what they were hired to do - engineering. It's much more cost-effective to just order the latest version from Amazon.com If there is a standard you would like published, let us know. Our web site is usgovpub.comHere are other NASA titles we publish: NASA-STD-5001BStructural Design and Test Factors of Safety for Spaceflight Hardware NASA-STD-5006AGeneral Welding Requirements for Aerospace Materials NASA-STD-5008BProtective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support EquipmentNASA-STD-5009ANondestructive Evaluation Requirements for Fracture-Critical Metallic ComponentsNASA-STD-5012BStrength and Life Assessment Requirements for Liquid-Fueled Space Propulsion System EnginesNASA-STD-5019AFracture Control Requirements for Spaceflight HardwareNASA-STD-5005DStandard for The Design and Fabrication of Ground Support EquipmentNASA-HDBK-8739.21Workmanship Manual for Electrostatic Discharge ControlNASA-HDBK 8739.23ANASA Complex Electronics Handbook for Assurance ProfessionalsNASA-HDBK-8719.14 Handbook for Limiting Orbital DebrisNASA-HDBK-8709.22Safety and Mission Assurance Acronyms, Abbreviations, and DefinitionsNASA-HDBK-7009NASA Handbook for Models and Simulations: An Implementation Guide For NASA-STD-7009NASA-HDBK-8739.19-2Measuring and Test Equipment Specifications NASA Measurement Quality Assurance Handbook - Annex 2NASA-HDBK-8739.19-3Measurement Uncertainty Analysis Principles and Methods NASA Measurement Quality Assurance Handbook - Annex 3NASA-HDBK-8739.19-4Estimation and Evaluation of Measurement Decision Risk NASA Measurement Quality Assurance Handbook - Annex 4NASA RCMReliability-Centered Maintenance Guide for Facilities and Collateral Equipment
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.